Olerib Vision — The Architecture of Intent

Independent Elemenos IPA standalone governance architecture that also integrates with Elemenos Adapt and third-party industrial systems.

Olerib Vision™

The governance gate between a decision and physical action.

Olerib Vision checks whether a requested industrial action is permitted and whether the available evidence supports it before local control executes. It does not replace the PLC, SCADA, DCS, operator or independent safety system.

The problem in plain language

Industrial systems can recommend and execute—but who checks whether the action is actually allowed?

Data, recommendations, operator approval and control execution are normally separate activities. Olerib adds a governed checkpoint between the proposed action and physical execution.

01

Data arrives

Sensors, laboratory systems, historians and business systems describe what they believe is happening.

02

Someone proposes an action

An operator, control application, optimisation service or AI suggests a change.

03

Olerib checks permission

Identity, policy, requested action, current state, route and available reality evidence are evaluated together.

04

Local control decides execution

A permitted request still passes PLC permissives and allocated safeguards. A denied or incomplete request does not proceed.

A concrete example

A request to open a transfer valve.

The same pattern applies to a setpoint change, recipe transition, route change, remote request or AI-generated recommendation.

Question Olerib asksExample evidenceIf the evidence is false or missing
Is the requester authorised?Identity, role, session and approved action classDeny or accountable escalation
Is the requested route permitted?Released configuration, valve route, receiver identity and capacityDeny; keep the transfer isolated
Does physical reality support the request?Sensor witness, equipment feedback and relevant passive Vision observationDeny or request new evidence
Are local protections ready?PLC permissives, route feedback and allocated SIS / ESD stateLocal control blocks; safety retains veto
Can the decision be reconstructed?Request, evidence version, policy version, result, reason and timeNo governed release

What the product consists of

Olerib governs. Vision observes. Foresight advises. Local control executes.

The names describe different responsibilities. Keeping them separate is the point of the architecture.

01

Olerib

Deterministic governance engine

Evaluates the requested action against the applicable policy, identity, context and evidence. Produces a permit, deny or escalation decision with a reasoned record.

No generic process or final-element actuation
02

Vision

Passive visual verification

Uses an independent, read-only camera-based observation layer to compare visible physical reality with the expected operating state where that evidence is relevant.

No PLC writes · no feedback control · no setpoint changes
03

Foresight

Bounded deterministic advisory

Evaluates a small, frozen future horizon around a questioned signal and can propose advice. Its output is evidence for review—not permission and never a plant command.

Advises only · cannot authorise or execute
04

Witness record

Decision traceability

Links the request, source data, reality evidence, applicable policy, configuration version, decision, reason and available outcome evidence.

Reviewable evidence; retention and security require project design
05

Local automation

PLC · HMI · SCADA / DCS

Receives a governed release where implemented, applies local permissives and executes the normal sequence through the engineered control system.

Physical execution remains local
06

SIS / ESD

Independent protection

Retains its allocated trip, veto or de-energise authority and does not wait for Foresight, Olerib or cloud connectivity.

Not replaced by digital governance

Olerib Foresight · 3 × 3

Three critical signals. Three discrete future steps. One bounded advisory.

Foresight is designed to add collective context without turning the advisory layer into an optimiser or controller. The active application defines the three signals and the approved deterministic model used for the bounded evaluation.

3 × 3T + 1T + 2T + 3
Signal 1Bounded stateBounded stateBounded state
Signal 2Bounded stateBounded stateBounded state
Signal 3Bounded stateBounded stateBounded state
01

Evaluate collectively

Use the approved context around the event: related signals, active Kit/configuration, route, current state and evidence quality.

02

Judge locally

Return advice only for the questioned signal or action. Do not globally optimise or silently move multiple control variables.

03

Require a clearly better case

A candidate advisory must satisfy the frozen decision rules and evidence threshold; uncertainty or conflict does not become approval.

04

Record the basis

The input snapshot, model/configuration version, result and reason remain linked so the advisory can be replayed and reviewed.

What a customer gets

A visible reason for every governed decision.

The value is not another dashboard. It is a defined authority boundary and an evidence package that can be reviewed by operations, engineering, safety, quality and audit roles.

Customer needOlerib contributionRequired project evidence
Control AI and optimisation recommendationsTreat every recommendation as an unauthorised request until policy and reality evidence support itApproved action classes, policy rules, interfaces and negative testing
Prevent invalid remote or operator actionsVerify identity, role, current state and the exact requested action before releaseAccess-control design, operating procedures and accountable escalation
Detect belief-versus-reality mismatchCombine control-system evidence with independent Vision observation where suitableCamera coverage, observation criteria, validation and failure response
Explain why an action was allowed or blockedCreate a structured decision record tied to source evidence and policy versionTime, identity, retention, cyber-security and record-integrity design
Integrate without replacing the plant controlsProvide a bounded governance interface above or around the existing automationReleased interface contract, cause/effect, FAT / SAT and site acceptance

Can / cannot

Clear authority boundaries.

OLERIB CAN
  • Evaluate a specific request against deterministic policy
  • Use identified evidence and context in that evaluation
  • Permit, deny or escalate through a defined interface
  • Record the decision basis for later review
  • Integrate with existing industrial data and control environments
OLERIB CANNOT
  • Replace the PLC, SCADA, DCS or independent safety system
  • Turn an advisory output into automatic plant authority
  • Invent missing physical evidence or assume stale data is valid
  • Guarantee cyber-security, safety integrity or regulatory compliance by architecture alone
  • Directly drive a valve, motor or other final control element

Olerib evaluatesVision observesForesight advisesPLC executesSIS / ESD may veto

Independent intellectual property

Olerib Vision is its own product and patent family.

It originated while Elemenos Adapt was being developed, but it is not limited to Elemenos equipment. The governance architecture can be engineered as a standalone layer, integrated with third-party control environments or embedded in a new EPC project.

IP / productPrimary subjectRelationship to Elemenos AdaptPublic status
Olerib Vision™Deterministic governance and execution-authorisation boundaryGoverns selected Adapt requests and can also be deployed independentlyIndependent IP · patent pending
Vision™Passive visual reality-verification subsystemOptional independent observation source where the project validates itSubsystem of Olerib Vision
Olerib ForesightBounded advisory evaluation across three evidence horizonsAdvises Olerib; has no permission or process-write authorityControlled architecture · release evidence required

Application areas

Where Olerib Vision is relevant.

These are target environments where proposed actions may need a defined policy, evidence and authorisation check before execution. They are not claims of completed deployments, certification or suitability for a particular safety function.

01

Critical infrastructure

National infrastructure systems: power grids, water networks, transport control and telecommunications; nuclear generation, fuel processing, enrichment and waste handling.

02

Energy & power systems

Thermal, renewable and distributed generation; power distribution; upstream oil and gas, midstream transport and downstream refining.

03

Chemical processing

Specialty and industrial chemistry, batch and continuous plants, hazardous-material and reaction management; pharmaceutical and aseptic manufacturing.

04

Industrial AI deployments

AI-assisted operations in physical-process environments and regulated AI environments such as finance, healthcare and defence.

05

Water & destruction systems

Municipal and industrial water treatment; PFAS destruction, hazardous-waste treatment and environmental remediation.

06

Regulated process industries

Food and beverage processing; semiconductor and precision manufacturing.

07

Mining & hydrometallurgy

Critical minerals, solvometallurgy, rare-earth recovery and acid-based extraction.

08

Autonomous & remote systems

Remote operations, distributed and offshore assets; defence and sovereign infrastructure.

Deployment context

Born inside Elemenos Adapt. Applicable beyond Elemenos equipment.

Olerib Vision originated from the need to govern Kit changes, routes and execution in Elemenos Adapt. Its authority model can also be engineered around third-party industrial systems where a separate execution-governance boundary is needed.

DeploymentHow Olerib is usedWhat remains local
Elemenos AdaptGovern Kit identity, released recipes, route evidence and requested transitionsModule PLCs, HMI, physical equipment and allocated protection
Existing industrial plantAdd a governed checkpoint around selected action classes and evidence sourcesExisting PLC / SCADA / DCS and safety architecture
New EPC projectEngineer the authority and evidence boundary into the project interfaces from the startProject control, protection, procedures and accountable operations

Olerib Vision™

Explore the dedicated Olerib site—or see its place in the Elemenos ecosystem.

The dedicated site explains the broader product origin, architecture, Vision subsystem and industrial application context. The Elemenos Digital Ecosystem page shows how Olerib relates to Runtime, Foresight, connected services and local plant authority.