Reaction Module

Provides the controlled reaction environment in which a released Chemistry Kit processes a qualified feed.

HOLD · engineering referenceProject engineering required

Module function

What it does—and what it does not do.

The functional boundary is explicit so a module is never treated as a universal process claim.

DOES

Defined module functions

  • Receives only qualified feed and released chemistry.
  • Maintains the project-defined reaction sequence and state.
  • Includes the reactor duty, reactor CIP boundary and raffinate transfer boundary.
  • Hands reacted material to an accepted downstream receiver.
DOES NOT

Explicit exclusions

  • A reactor model is not a universal throughput or recovery guarantee.
  • No chemistry runs outside its released Kit envelope.
  • Reference nozzle and vessel configurations are not procurement release data.

How the module works

The RM mechanism, step by step.

Each step names both the physical function and the evidence required before the next handover.

01Verify configuration

Configuration and authority record accepted.

02Charge / feed

Feed, route and permissives proven.

03React

Required measurements remain inside the released envelope.

04Verify endpoint

Endpoint or accountable hold decision recorded.

05Transfer / clean

Receiver and cleaning completion confirmed.

Stream schedule

Every inlet, product and residual has an owner.

A stream is not released merely because the equipment can move it. Its state, route and receiving boundary must be accepted.

StreamDirectionPhysical handoverAcceptance / release basis
Qualified process feedInletUtility → RMRM inlet state, route and Kit compatibility verified.
Released chemistryInletControlled Kit supply → RMRecipe identity, concentration, materials and safety basis released.
Reacted slurry / liquorProduct / intermediateRM → SHM or named receiverReaction state and downstream readiness verified.
RAFF / CIP / off-specResidualRM → allocated receiverSeparate route, containment and status defined.

Published datasheet

What is fixed, selectable and project-specific.

Unsupported values are never guessed. The table states either the current public definition or exactly how the value is established.

Specification fieldCurrent definitionEvidence basis
Product codeRMFixed architecture
Product familySolid-process moduleFixed architecture
Typical process positionCore Adapt processFixed architecture
Reference configurations20C: 1× AE630 / DN40; 20X: 2× / DN65; 40S: 6× / DN80; 40P: 8× / DN100 in 4+4.Configuration option
Reference statusEngineering reference only; not a performance guarantee or procurement release.Fixed architecture
Reaction dutyDefined from representative testwork, kinetics and mass / energy balance.Project-specific
Residence time / cycleEstablished from the released Chemistry Kit and testwork basis.Project-specific
Temperature / pressureSet by chemistry, heat/gas generation, equipment and system envelope.Project-specific
MaterialsSelected from chemistry, corrosion, erosion, temperature and cleaning review.Project-specific
Agitation and heat transferSelected from rheology, solids, kinetics and thermal duty.Project-specific
PerformanceRecovery, conversion and product quality require qualified testwork and receiver criteria.Not publicly released

Interface schedule

What crosses the module boundary.

Process, utility, residual and control handovers are listed separately so responsibility is visible.

InterfaceClassHandoverAcceptance evidence
Process inletProcess inControlled feed from UtilityFeed and Kit envelope satisfied.
Chemistry inletKitReleased reagent and recipe functionsIdentity, concentration, route and authority valid.
Process outletProcess outReacted material to SHM / named receiverEndpoint and receiver proven.
CIP / RAFFResidualAllocated cleaning and raffinate receiversRoute and ownership explicit.
AutomationControlsRecipe state, setpoints, evidence, permissives and alarmsLocal PLC executes the released sequence.

Operating envelope

The applicable limits form a hierarchy.

The system envelope, Kit or chemistry limits, installed module configuration, project evidence and receiver criteria all apply. The narrowest valid limit governs.

Envelope layerGoverning ruleChecks before release
SystemThe reactor remains inside the locked Adapt system design envelope.pH, temperature, viscosity, chloride, conductivity and selected qualification pack.
KitEvery chemistry has its own released operating envelope and recipe boundaries.Concentration, order, timing, materials, hazards and endpoint.
ModuleThe selected 20C / 20X / 40S / 40P configuration defines installed physical limits.Vessel, connections, mixing, heating/cooling and instrumentation.
ProjectRepresentative evidence defines the qualified duty.Feed variability, kinetics, scale-up and downstream acceptance.

Safety, cleaning and lifecycle

The module includes more than the process duty.

Safe state, cleaning, maintainability and evidence gates are part of the technical definition, not afterthoughts.

01

Safety & release

  • Confirm heat, gas, foam, pressure, corrosive chemistry and mixing hazards.
  • Use independent allocated protection and local interlocks; Olerib does not replace SIS/ESD.
  • Block chemistry or discharge when configuration, route or receiver evidence is incomplete.
02

Cleaning & changeover

  • Reactor CIP is inside the RM scope and is released per Kit / changeover basis.
  • Verify cleaning media, sequence, waste receiver and completion evidence.
03

Engineering & service

  • Treatability, kinetics and materials programme.
  • Scale-up, reactor selection and recipe engineering.
  • FAT/SAT and case-specific performance verification.

Project inputs

What is needed to complete the specification.

  1. 01

    Representative treatability testwork and released chemistry route

    REQUIRED
  2. 02

    Feed composition, mineralogy and variability

    REQUIRED
  3. 03

    Mass-and-energy balance

    REQUIRED
  4. 04

    Reaction kinetics, residence-time and temperature basis

    REQUIRED
  5. 05

    Gas, heat, foam, corrosion and erosion basis

    REQUIRED
  6. 06

    Materials selection, agitation, instrumentation and downstream acceptance criteria

    REQUIRED

Evidence register

Controlled source and publication boundary.

The source status is shown so a functional public summary cannot be mistaken for a released procurement or performance specification.

Controlled documentRevisionStatusVerified basisPublic claim scope
EA-RM-SCP-001RevCHOLD · engineering reference2026-07-22Reactor, reactor-CIP and RAFF scope plus reference model configurations. No universal performance release.